Production Version 5.142.0 (20 November 2026)
This is a security release. Nothing changes in how Hooqs sync, and nothing needs to be reconnected or approved again.
What is new
Safer first pairing between two Jira sites
When two Jira sites connect for the first time, Hooq now accepts the partner only if an admin on this site generated a connector code for that partner. Before, the first connection request was trusted on its own.
- Connectors that already exist keep working. Reconnect works as before.
- As before, the partner must use a connector code within 5 minutes of it being generated.
- A pairing that was started with a code generated before this release is refused. Generate a new code and pair again.
Stricter checks on incoming messages
Hooq now checks the identifiers in a message from a partner site before it processes the message. A message for a Hooq that does not exist on this site is refused and nothing is saved. The refusal text in the logs no longer repeats what the sender sent.
Good to know
- For up to 5 minutes after you click Reconnect, a message from the partner site can be refused with "invalid signature". It is accepted after that. This is not new in this release.
- If the partner site answers "too many requests" while a comment is being copied, that comment can be missed. This is not new in this release.
Want to raise a ticket? Click here (opens in a new tab)
